Skip to content

Sub-industry · Roofing Contractors

A roof job that never sits still between the lead and the ladder.

We build the pipeline roofing crews run every job through (estimate, survey, quote, scheduled, complete) so a lead never idles waiting for someone to move it forward.

Every lead lands on the pipeline, off the sticky notesA quote that goes quiet gets chased on its ownSurveys book around the forecast
pipeline · roofing desk live

Pipeline · 5 jobs

Tue 12 Jun

Estimate

214 Birchwood Dr

Asphalt shingle · 24 sq

Scope pending

Lead in · 20 min ago

Survey

88 Redgate Ct

Standing-seam metal

Draft $18,400

Survey Thu 9:00 AM

Quote

1204 Alder Ave

Asphalt shingle · 31 sq

$14,750 sent

Awaiting decision

Scheduled

77 Millrace Ln

Clay tile

$26,900

Crew B · Mon 7:00 AM

Complete

39 Harborview St

Asphalt shingle · 18 sq

$15,200 closed

Final walk done

Quote Q-2291 · no reply in 48h -> follow-up sent, survey re-offered for Thursday

Where a job sits right now, and what it's waiting on

The pipeline

Five stages, one board, nothing waiting in a drawer

This week's pipeline, illustrative. A job only leaves a stage once the next one has actually started.

9

Estimate

6

Survey

7

Quote

4

Scheduled

14

Complete

Where a job stalls

Six ways a high-ticket roof job goes sideways

Storm leads flood in and go cold

A hailstorm can put two hundred numbers on the phone in a single afternoon, and most roofing offices still work the list one call at a time.

The slow estimate loses the bid

A homeowner comparing three roofers signs with whoever shows up first with a number, not whoever would have done the better job.

Surveys get missed or no-showed

A crew drives out to measure a roof and finds no one home, because the visit was never confirmed the day before.

Quotes go quiet after they're sent

A priced proposal sits in an inbox for two weeks with nobody following up on the decision it's waiting on.

Weather rewrites the week daily

A crew booked for Tuesday can't tear off a roof in the rain, and re-slotting six jobs by phone eats the whole morning.

Warranty callbacks get lost in email

A leak six months after the job goes to whichever inbox the homeowner happens to find, instead of the crew who can actually fix it.

None of this is a staffing problem. It's a pipeline problem, and the board just needs to hold every job at once.

The estimate

Every roof type takes its own path to a price

A shingle tear-off and a commercial flat roof get scoped differently, so the estimate splits by what's actually on the deck.

Steep-slope & shingle

  • Ladder-assist photo capture at the door
  • Pitch and square takeoff pulled from the survey
  • Shingle-line pricing by manufacturer tier
  • Storm-damage documentation ready for a claim

Low-slope & metal / flat

  • Drone flyover for flat and low-pitch decks
  • Membrane and seam condition notes
  • Tonnage and drainage takeoff
  • Commercial multi-building batching
SurveyPhotosSV-3142

SV-3142 · 88 Redgate Ct

Roof survey

Measured
Roof age17 years
Squares26.5
Pitch8/12
Layers1, tear-off required
DeckingSound, 2 sheets to replace
Photos34 captured, drone flyover

Synced from the flyover the moment it lands

Flagship · the survey

A survey that arrives at the estimate already knowing the roof

Roofing estimates go stale in the gap between the survey and the price, and the gap exists because the survey arrives as photographs somebody has to interpret. Measurements that travel with the file are what let the estimate be written the same day the crew leaves.

Once a measurement visit wraps, nobody types the file up from a notepad. Squares, pitch, layers, and decking condition are already sitting on it, photos and all, before the estimator opens the job.

  • Measurements and pitch pull straight from the flyover, with no tape-measure guesswork
  • Photos and decking notes travel with the file into the estimate
  • A scope this complete prices itself the same day the crew leaves the driveway
  • The survey closes back to the pipeline the moment it's uploaded

Lead to closed roof

Watch a real lead move through the pipeline

Hand over a lead sitting in your inbox right now and we'll run it through capture, survey booking, and quoting on your own numbers, so you can watch the pipeline build the job in real time.

Storm-ready intakeSurveys that confirm themselvesQuotes that get chased

On the pipeline right now

9

Estimate

6

Survey

7

Quote

4

Scheduled

14

Complete

How the job moves

From a captured lead to a crew on the roof

Stage 01

Capture every lead

Calls, forms, and storm-chaser traffic all land on one pipeline the moment they come in, day or night.

Stage 02

Book the survey

A measurement visit gets offered, confirmed, and reminded automatically, so a crew never drives to an empty driveway.

Stage 03

Price the scope

Squares, pitch, and material choice turn into a priced quote the same day the survey wraps.

Stage 04

Schedule around the forecast

Installs slot into the weather window as well as the calendar, and re-flow automatically when one closes.

Each stage lays over the last. The pipeline is moving real leads well before the rollout is finished.

Weather windows

The calendar proposes a day. The forecast decides.

Illustrative forecast. A crew only gets slotted into a tear-off on a day the roof can actually stay open.

Mon

Clear

Install

Tue

Clear

Install

Wed

Rain

Hold

Thu

Wind 28 mph

Hold

Fri

Clear

Install

Sat

Clear

Install

Sun

Scattered showers

Hold

Warranty & aftercare

What a homeowner is covered by once the crew packs up

Materials

25-year manufacturer

Registered automatically the day the last course goes down.

Workmanship

5-year labor guarantee

Covers install defects, tracked back to the crew and the job file.

Post-storm reinspection offered automatically after severe weather

An annual inspection reminder before the season that finds problems early

Warranty claims route straight to the crew that did the original job

Questions

What an office asks before it switches the board

Yes. Every call, form, and storm-chaser lead lands on the same pipeline the moment it comes in, so a two-hundred-lead day gets worked in order, whoever happens to answer the phone.

Every measurement visit is offered, confirmed, and reminded automatically the day before, so a crew shows up to a driveway that's actually expecting them.

A priced proposal that goes quiet gets a scheduled follow-up, so a decision doesn't quietly disappear into an inbox.

Installs slot against the forecast as well as the calendar, and a closed weather window re-flows the affected jobs automatically, with no round of phone calls.

We integrate with the estimating, scheduling, and CRM tools your crews already use, so the pipeline and your existing systems stay in sync.

Have a project?

Let's talk

Running a large platform, shaping a first MVP, or getting a product ready for a funding round? Tell us where you are. We'll shape the process around it, and stay with you after launch.