Skip to content

Logistics & Distribution · Warehousing & Fulfillment

A bin the system can't see is a stockout nobody saw coming

We build the live stock sync, reorder alerts, and cycle-count scheduling that keep a warehouse floor honest: every bin, every SKU, read the same way by the system, the picker, and whoever is planning tomorrow's wave.

Every bin checked against its reorder point, liveAnswers a stock question the moment someone asksFlags a bin before it turns into a stockout
bin map · aisles A–D live
AISLE AAISLE BAISLE CAISLE DMEZZ
BinSKUOn hand
A-14-03SKU 8821 · Poly Mailer 10x13640
Alloc 90 · Reorder 200ok
B-02-11SKU 4410 · Foam Corner Set34
Alloc 40 · Reorder 120low stock
C-07-05SKU 9902 · Kraft Void Fill512
Alloc 60 · Reorder 150ok
A-19-02SKU 1187 · Strap Buckle 25mm11
Alloc 18 · Reorder 50low stock

Stock agent

Which bins are under their reorder point right now?
B-02-11 and A-19-02. A-19-02 also has a cycle count in progress.

Low-stock flag → B-02-11 replenishment task created, pick team notified

The fields are real; the floor underneath them is a placeholder for yours.

Where accuracy breaks down

Five rules a warehouse floor breaks without live data

S.01

A phantom count is worse than an empty bin

When the system says forty and the shelf says four, every order built on that number is already wrong before a picker gets there.

S.02

Reconciliation done monthly finds shrinkage too late

Receipts, picks, and returns drift apart quietly, and a count run once a month only tells you how much was already lost.

S.03

A bin with no reorder point waits for someone to notice

Without a live threshold, a SKU runs out silently until a picker reaches an empty shelf mid-order.

S.04

A mis-pick costs more at the dock than at the shelf

The wrong item leaving a bin is cheap to catch at the source and expensive to catch after it has already shipped.

S.05

Peak volume turns a manual count into a guess

The busier the floor gets, the less time anyone has to walk an aisle and confirm what the system already claims to know.

Every one of these shows up long before a stockout does, usually as a count nobody trusted enough to act on.

Cycle counts

Every rack, accounted for on a rolling schedule

Aisle A: Fast pick

18 racks · 340 SKUs

Last count: Today

Aisle B: Bulk storage

24 racks · 210 SKUs

Last count: 3 days ago

Aisle C: Returns staging

9 racks · 96 SKUs

Last count: Yesterday

Aisle D: Cold storage

12 racks · 128 SKUs

Last count: Today

Mezzanine: Overflow

15 racks · 87 SKUs

Last count: 5 days ago

Dock staging

6 racks · 42 SKUs

Last count: Today

Nobody schedules a count by hand. The rotation already knows which aisle is due next.

The bin map

The bin-by-bin view a floor actually works from

BIN 01

Live bin & stock sync

On-hand, allocated, and reorder points stay synced across the WMS, ERP, and every channel selling against the same stock.

Real-time syncMulti-channelBin-level detailNo phantom counts
A-14-03SKU 8821 · Poly Mailer 10x13640
B-02-11SKU 4410 · Foam Corner Set34
C-07-05SKU 9902 · Kraft Void Fill512
BIN 02

Reorder & replenishment agent

A bin crossing its reorder point raises a flag and a replenishment task on its own, before a picker ever finds it empty.

Threshold alertsAuto taskPick-team notifyVendor suggest
Which bins are under their reorder point right now?
B-02-11 and A-19-02. A-19-02 also has a cycle count in progress.
BIN 03

Cycle counts that run on a schedule

Counts run on a rolling schedule by aisle, catching drift while it's still small enough to fix quietly.

Rolling scheduleVariance flagsBlind countsAudit trail
BIN 04

Pick, pack & return accuracy

Guided picking and return putaway keep what leaves and comes back matched to the bin it actually belongs in.

Guided pickingScan verifyReturn putawayException queue

Every tile above reads from the same bin map, never a spreadsheet someone updates after the fact.

Replenishment

A bin below its reorder point should never wait for a picker to find it

The moment on-hand crosses a bin's reorder point, a task opens and the pick team is notified, before an order fails and before anyone has to walk the aisle to check. The same agent tells a picker or a planner exactly what's left and whether it covers what's already been promised.

  • Flags a bin the moment on-hand crosses its reorder point
  • Opens a replenishment task without waiting for someone to notice
  • Answers a picker's or planner's stock question from the live count
  • Leaves one record behind, with no retyped counts, texts, or clipboard tallies
Bin B-02-11 · Foam Corner Set
On hand 34Reorder 120Cap 200
Reorder threshold crossed · Bin B-02-11 · 7:04 AM
B-02-11 dropped to 34 units against a 120 reorder point. Replenishment task created and sent to the pick team.
Do we have enough to cover this morning's orders?
Yes. 34 on hand covers the 21 already allocated. The task closes the gap before the next wave.

Separately: A-19-02 flagged for a cycle count in progress before its next allocation is picked.

The bin, the count, and the exchange shown here are illustrative; the logic behind them is what ships.

Point it at a bin you're tracking on a spreadsheet today

The bins above are illustrative. Load a real aisle into the same sync, reorder, and cycle-count logic, and watch it flag the one bin your team would otherwise catch by accident.

What ties into the floor

Every scanner and every system already running the warehouse

Aisle A · Capture equipment

Handheld scanners
Fixed-mount readers
Pick-to-light
Voice pick

Aisle B · Already on the floor

WMS

Bin, order, and task data reads and writes straight into the warehouse management system you already run.

ERP & accounting

On-hand and allocated numbers reconcile against the ledger without a separate spreadsheet in between.

Sales channels

Marketplace and storefront inventory stays capped to what a bin can actually cover.

Carrier & shipping

A picked and packed order hands off to shipping with the bin it came from still attached.

Getting live on the floor

Four slots between a spreadsheet and a floor that trusts its own numbers

SLOT 01

Map the floor as it runs today

We walk the aisles, the bins, and the counts you already keep, and find where the numbers stop matching the shelves.

SLOT 02

Connect the WMS and scanners

We wire in the systems already running the floor, so bin, order, and count data sync without double entry.

SLOT 03

Go live on sync and reorder alerts

Live stock sync and the reorder agent launch first, tuned against real bins and real order volume.

SLOT 04

Turn on cycle counts and exceptions

A rolling count schedule and pick/pack exception handling go live once the floor trusts the numbers.

We build on top of the WMS and scanning equipment already running the floor. No rip-and-replace.

The pick wave

What changes once a wave releases against real stock

A bin never runs out quietly

Every SKU is checked against its reorder point continuously, whether or not anyone walks past.

Counts stop being a fire drill

A rolling cycle-count schedule catches drift in small pieces, so there's no chaotic count once a quarter.

Fewer mis-picks reach the dock

Guided picking and scan verification catch the wrong item at the shelf, before it ships.

A pick wave clears without surprises

Orders release against stock that's actually there, so a wave finishes instead of stalling on a phantom bin.

These bars show a rhythm, not a report. Real accuracy and pick-rate figures live only inside a verified case study.

Questions

What warehouse teams ask first

Bin-level stock syncs in real time across the WMS, ERP, and every channel selling against it, so a count reflects the shelf instead of a stale batch job.

A replenishment task is created automatically and routed to the pick team, without waiting for someone to notice the shelf is thin.

Less often. A rolling cycle-count schedule checks aisles in small pieces continuously, so drift gets caught before it needs a full shutdown count.

Yes. A picker or planner can ask which bins are low or when a count is due and get an answer straight from the live floor data.

No. It connects to the WMS, ERP, and scanning equipment you already run, so bin, order, and count data stay in one place.

Have a project?

Let's talk

Running a large platform, shaping a first MVP, or getting a product ready for a funding round? Tell us where you are. We'll shape the process around it, and stay with you after launch.